1772 Church St project update

Updated plans for 1772 Church St are available HERE.

These plans will likely be on the Historic Preservation Review Board’s consent calendar for their June 25th meeting. Accordingly, at the meeting, Board members will make a decision whether the project should go to another full hearing (with presentations and verbal testimony), or if the project should be delegated to staff. The board will not hear any testimony on the 25th, instead it will base its decision on letters it receives from the public beforehand.
Please send any letters to Kim Elliott (kim.elliott@dc.gov) by June 23rd, and she will email them to Board members (June 18th is the deadline for a hard copy to be included in Board members’ review packets).
Furthermore, testimony should ONLY pertain to how effectively the applicant addressed the 5 design issues that the Board articulated at the May hearing:

1. Residential bays to align more with the setback along Church St. as the church building is the “bookend” landmark at the end of that block–possible solution to move back residential façade so that face of bays are aligned with Parish Hall façade (+/-3’)
2. Work on stepping back or reducing the upper floors (6+7) to minimize perceived mass.
3. Look at scale of residential windows compared to the rest of church street rowhouses
4. Refine the glass detailing of upper and at the main entrance levels of church to reflect what the actual condition will be as it relates to transparency and construction.
5. Landscape at front of church needs to be developed and integrated

Because of this expedited process, the ANC has submitted a resolution asking the project to be removed from the June consent calendar (for time to review and receive community comments). While the ANC has been told the project is still expected to go before the Board on June 25th, we will soon have a better understanding of how HPRB plans to address the ANC resolution.

ANC 2B passes 1772 Church St. Resolution May 2015

On Wednesday May 13, 2015, ANC 2B passed the below Resolution by a vote of 7-0 regarding the development project at 1772 Church Street, NW (the “Project”). Two amendments to the Resolution, presented by Commissioner Maltz, were passed by the ANC. The amendments were based on language that CAS Riegler, the Project developer, submitted to select commissioners* prior to or during the meeting.  A copy of this language (the “CAS Riegler Amendment Language”) is available HERE.

The Commission will forward a letter containing this below resolution to the Historic Preservation Review Board. HPRB will review the project on June 4th (the May 2015 overflow date).

* The author of this post, ANC 2B07 Commissioner Justine Underhill, was notified of the existence and content of the CAS Riegler Amendment Language only after the termination of the May 13, 2015 meeting.


 

1772 Church St HPRB May 2015

WHEREAS the development at 1772 Church Street NW has been reviewed by Advisory Neighborhood Commission 2B (ANC 2B) and the Historic Preservation Review Board multiple times; and

WHEREAS during the last project iteration, the Historic Preservation Review Board requested the applicant address ANC 2B’s resolution passed without opposition at the March 11, 2015 ANC 2B meeting, which is attached for your convenience; and

WHEREAS the ANC 2B resolution specified several conditions to ensure compatibility of the project with the historic neighborhood; and

WHEREAS while most stipulations were met, ANC 2B believes the following two stipulations were not met:

“The residential building seen from adjacent at-grade vantage points including the entirety of Church Street, P Street, 18th Street, and the public alley between Church and P Streets be between 40 and 59 feet tall, including mechanicals, and maintain existing setbacks.”

“Alterations are made to the exterior design so that the corrugation of the Church Street buildings’ facades and the rhythm of the Church Street buildings’ roof lines are in scale with the surrounding buildings.”; and

WHEREAS ANC 2B believes the residential component of the project as presented does not satisfy the height stipulation from many at grade vantage points on Church Street, 18th St, and in the public alley— including from the corner of 18th and P, Church Street from 17th Street to four rowhouses from the parish hall, and from the 17th Street vantage point in the alley.

THEREFORE, be it RESOLVED ANC 2B finds the proposal not in compliance with the March 2015 ANC 2B resolution; ANC 2B recommends the Historic Preservation Review Board require changes to the project massing and design that meet the conditions of the March resolution in their entirety.

Be it further RESOLVED that to fit the rhythm of the surrounding context, ANC 2B believes the bays on the residential component, which abut the property line, should be set back such that they are in line the Church Street buildings’ facades.

Draft resolution for 1772 Church St

On Wednesday, May 13 at approximately 8:55pm at the Brookings Institution, ANC2B will review modified plans for 1772 Church St. and will vote on recommendations to the Historic Preservation Review Board. You can view the latest plans HERE and see our meeting agenda HERE.

On March 11, 2015 ANC 2B passed a resolution by a vote of 7-0-2. You can view the resolution HERE. The below resolution is based on the compromise the ANC brokered in March.

We remain very open to feedback on the specific language. Please send comments to Commissioner Justine Underhill (2b07@anc.dc.gov) or to all of the commissioners (commissioners@dupontcircleanc.net).

—————————

DRAFT RESOLUTION

WHEREAS the development at 1772 Church Street NW has been heard by Advisory Neighborhood Commission 2B (ANC 2B) and the Historic Preservation Review Board multiple times; and

WHEREAS during the last project iteration, the Historic Preservation Review Board requested the applicant address ANC 2B’s resolution passed unanimously at the March 11th ANC meeting, which is attached for your convenience; and

WHEREAS the ANC resolution specified several stipulations for compatibility of the project; and

WHEREAS while some stipulations were met, ANC 2B believes the following two stipulations were not:

“The residential building seen from adjacent at-grade vantage points including the entirety of Church Street, P Street, 18th Street, and the public alley between Church and P Streets be between 40 and 59 feet tall, including mechanicals, and maintain existing setbacks.”

“Alterations are made to the exterior design so that the corrugation of the Church Street buildings’ facades and the rhythm of the Church Street buildings’ roof lines are in scale with the surrounding buildings.”

WHEREAS ANC 2B believes the residential component of the project as presented does not satisfy the height stipulation from many at grade vantage points on Church Street, 18th St, and in the public alley— including from the corner of 18th and P, Church Street from 17th Street to four rowhouses from the parish hall, and from the 17th Street vantage point in the alley.

THEREFORE, be it RESOLVED ANC 2B opposes this proposal; ANC 2B recommends the Historic Preservation Review Board to not find the proposal compatible with the Dupont Circle Historic District until the conditions of the March resolution are met in entirety.

Be it further RESOLVED that to fit the rhythm of the surrounding context, ANC 2B believes the bays on the residential component, which abut the property line, should be set back such that they are in line with Church Street buildings’ facades.